I thought, since my carefully documented build is soon to be relegated to the internet scrap heap, I’d start again from where I left off:

On the 20th of April 2014 on a thread somewhere I posted this:

**As some of you are aware, I once had a nicely appointed place in which to doodle with tools and whatever took my fancy. My tools were neatly stored, mostly clean and sharp and life was quite pleasant during those times when I wanted to hide from the world.

That was then and this is now.

For the last three summers I have been making do with a black hole of a space under our house. Tools have become progressively more rusty, and more broken, the place more depressing and despairing. On the other hand, tools have also become more worn from use as I’ve been working pretty much full time on the reno, but it’s all out of hand.

So the plan is to start on the workspace fit out when we get back in November, and I have a month to pack things away to get some semblance of order.

In order to distract myself, from the job in hand (designing the new dust extraction system), I thought I start this thread.

Watch this space.

P**

This was followed up immediately (in Midge time) five days later with this:

**Major, I am starting the dust system first this time… well I’ve found where I stashed the gates for the old one anyway.

Wongo, there is plenty of dust on these tools, most of them are worn out, but it’s mostly from misusing them, cutting concrete formwork and things like that. I currently don’t have a combination of belts, motors or broken bits to cobble together a belt sander for instance, out of the four I own.

But settle back for a looong ride anyway!

Let’s start with the blank canvas we took on three years ago. As you can see, it’s a nicely finished patchwork of textures and has a fully tiled floor - three different tiles and four tile patterns. There’s plenty of space, but some of it has to eventually turn into house/studio space and of course some of it has to house the car.

But this is where we began:-

0_1493661989274_2011-03-20 at 11-50-47.jpg

Now it looks like this:- (Cute vintage effect to disguise poorly exposed out of focus pictures.)

1_1493662006407_2014-04-25 at 07-50-08.jpg 0_1493662006406_2014-04-25 at 07-49-55.jpg

It’s actually a big black hole, so I’ve set about installing twelve double fluorescent troffer light fittings that will be flush with the ceiling, (I’ll have a ceiling painted white) even thought it’s a bit low, and will rebuild the bathroom upstairs to get the shower and bath wastes out of the way.

I’ve already replaced the purple/blue roller door with a frightfully expensive aluminium and polycarbonate one, which helped the light situation no end.

Next we’ll have a bit of a tidy up and try to get all the furniture back on its feet, but after that:

New partitions will be ply sheeted, exposed brick bagged and painted (white) floor either epoxied or polished concrete - both solutions are cheaper and easier than trying to fix the tiles, many of which are cracked or broken and all of which are 'orible.

None of this happens this year of course, so I can create a long list, but I hope to build new cupboards -realistically the next move will be to somewhere suitable for old people, so smaller, lighter, not built-in cabinets that can fit around the edge of a single car garage are the go.

So there you go.

After the clean, nothing to happen till November!

Cheers,

P**

last edited by bitingmidge

By March 2016 the dust extraction system was well underway, and I posted this photo as proof:

0_1493662220329_postcard from Moffs-1.jpg

In June, solid progress was evident, I clearly hadn’t been mucking round these past three years:
0_1493662313678_Fading Mem 23June-1.jpg

Alas by January 2017, things had taken a slight backward step:

Yeah well,the shed’s going well. Thought I’d get stuck in this month, then discovered to get the back wall in I really had to rebuild the bathroom and laundry, and to get the power points where I wanted 'em I needed walls, and once there are walls I need plasterboard to make the wires safe. Then of course I can’t get the skirting on until after the floating floor goes down, and we need a ceiling as well to hang the light fittings from.

Day four, the tiles are jacked up and at the tip, the ceiling is in a neat pile marked “asbestos do not breath”, the bathroom walls (well the bathroom really) have disappeared, and if I can get a grinder over the weekend the floor will be ready to start framing on Monday.

Looks like the shed will have to wait till next year.

Cheers,

P

0_1493662462149_Dec-28.jpg

last edited by bitingmidge

Just testing to see if I can reply. The shed doesn’t look any tidier.

So where can we get an “ectoplasm bunny” T-shirt? I’m sure that it’s far more likely that I’ll be seen walking down George street, wearing one of them, very much alive, than it is that I’ll see your completed dust extraction system. :)

Mind you, your dust extraction system being completed is now far more likely than mine being completed since I’ve decided to take most of my machines to work with a view to using them to actually do a couple of jobs for myself (bedside tables, hall table) before (hopefully) selling them to school.

Mick

@JMick the tee shirt? I didn’t get the name of the shop, but there were a few of them around Tokyo - you might get one to fit yourself, but the “large” sizes weren’t!

Just the thing to wear to a school board meeting.

A lot of water has passed under a lot of bridges since that photo was taken, and we’ve been on a boat going under most of them.

But, we have a working laundry, bathroom tile waterproofing happening today, the rest of the tiles are being stripped out of the garage and shed tomorrow - after taking 50m2 out with my super Ozito jack hammer, and grinding the slab above, someone else is doing the next 50!

Tiles next week.

Shed ceiling is in finished and lit, I’ve rendered (bagged) the exposed brick, and just need to line the walls once the tiles are in. Realistically, since we have to go back to our other home next month - we may not get started on the dust collection system, but I can almost smell the end of the reno work after five years.

Watch this space.

I guess I’m going to have to get up early to finish clearing it out… not much to go, but no where to put anything else!

0_1498977747245_July shed-10.jpg